HOME
BUILDING
PLANT
INFRA
ESG
DOWNLOAD
Connecting the World to Make It
Easier to Live In
We empower better quality of life and economic growth
while leading change to make the world a better place.
POSCO E&C is contributing to the development of the nationand local communities by
making a conspicuous figure in virtuous cycle of resources, such as infrastructure that
acts as the basisfor various industrial activities like roads, railroads, ports,and bridges,
as well as water treatment and waste-to-energy facilities in Korea and abroad.
Jido-Imjado Bridge
Construction Project, Korea
(1st and 2nd Imja bridges)
POSCO E&C’s first cable stayed bridge
over the sea that improved transportation
in island regions.
Jido-Imjado Bridge Construction Project, Korea was the
first cable stayed bridge built over the sea that reduced
the travel time from one hour by a vessel to five minutes
by car, significantly improving the transportation system
for local island residents.
In addition, POSCO E&C used high-strength
steel and won the Best Construction
Project Award in a Symposium held by
the Korean Society of Steel Construction.
CLIENT
IKSAN REGIONAL CONSTRUCTION
AND MANAGEMENT ADMINISTRATION
TYPE
ROAD CONSTRUCTION
(L=4.99km(2 LANES),
CABLE-STAYED BRIDGE 2EA: L=1,885m,
INTERSECTION 3EA)
CONSTRUCTION PERIOD
2013.10 –2021.3
East Breakwater Construction Works For The Ulsan Port
Building of the world-class oil hub
in Ulsan port.
The 1.42km breakwater facility in the new southern port of Ulsan along the coast of
Ulsan is a project to protect the second Northeast Asia oil hub business complex from
the mighty waves that come from the southeast.
Once the breakwater
facility is built, the second
phase of the oil hub project
will gain momentum,
safeguard moored vessels
and nearby facilities from
sea waves, and make it
more convenient for visitors
to use the facility.
CLIENT
ULSAN REGIONAL OFFICE OF
OCEANS AND FISHERIES
TYPE
CONSTRUCTION OF
THE BREAKWATER (1,411m
(CAISSON 47EA), DCM 1 LOT,
MISCELLANEOUS 1 LOT)
CONSTRUCTION PERIOD
2016.11-2022.6
Waste-to-Energy Plant in Krakow, Poland
The biggest Waste-to-Energy facility
in Poland. This facility generates
Electric power and heat using wastes. It
has the uninjury record during construction
and green energy certification. Also, it is
operating smoothly without defects.
The Krakow waste incinerator in Poland is the largest waste treatment
plant in the country that can process 220,000 tons of municipal waste
in a year. They then use the energy obtained in the process to provide
electricity and heat to nearby areas.
POSCO E&C received the zero defects
,zero accidents certification in the safety and
environmental assessment by the Krakow City
Labor Office and another inspection by the regional
Environmental Protection Agency thanks to their
systematic control of factory systems that complies
with the European environmental standards.
CLIENT
K.H.K (KRAKOWSKI HOLDING
KOMUNALY S.A)
TYPE
WASTE TREATMENT POWER PLANT
(220,000ton/year(340ton/DAYx2 LANE),
POWER GENERATION : 10.7MWh)
CONSTRUCTION PERIOD
2012.10–2016.6
Donghae Nambu Line(Railroad) Deokha train depot
The largest railway vehicle base
in Korea.
Busan-Ulsan Deokha vehicle base on the Donghae Nambu line
is the railway facility that manages trains that travel along
the Donghae Line, Jungang Line, and the Daegu Metro line.
The railway vehicle base built on a land area of
34,198m2 is comprised of a low-maintenance
plant where they conduct daily inspections like
simple checks and cleaning, a high-maintenance
plant where they disconnect and examine trains
that have reached the inspection cycle, and
a management building that supervises the
entire vehicle base, and 13 attached buildings.
CLIENT
NATIONAL RAILROAD CORPORATION
TYPE
RAILWAY (TRAIN 28 VEHICLE DEPOT,
ANCILLARY FACILITIES
FOR VEHICLE DEPOT)
CONSTRUCTION PERIOD
2014.5-2021.6
Roads
INCHEON—GIMPO
EXPRESSWAY
CLIENT
INCHEON GIMPO
EXPRESSWAY CO.,LTD.
TYPE
HIGHWAY ROAD CONSTRUCTION
(L=3.6km, TUNNEL 1EA : 3,600m)
CONSTRUCTION PERIOD
2012.3–2017.3
DONGHONGCHEON—
YANGYANG EXPRESSWAY
CLIENT
KOREA EXPRESSWAY CORPORATION
TYPE
HIGHWAY ROAD CONSTRUCTION
(L=5.62km(4 LANE),YEONGDEOK
3 TUNNEL : 1,311m, BRIDGE : 900m,
TUNNEL 3EA : 1,640m,
BRIDGE 9EA : 1,268m, IC : 1EA)
CONSTRUCTION PERIOD
2009.3–2017.7
CONSTRUCTION WORKS FOR
REHABILITATION OF NATIONAL ROAD N104
BETWEEN NAMPULA AND NAMETIL IN
NAMPULA PROVINCE—MOZAMBIQUE
CLIENT
ANE
TYPE
REHABILITATION OF
NATIONAL ROAD
(UNPACKAGED → DBST, 2LANE,
L=70.6km, BRIDGE(6EA, L=130m)
CONSTRUCTION PERIOD
2018.1–2020.7
Offshore
GUMI HIGH—TECH
VALLEY SITE
BUILDING WORK
CLIENT
KOREA WATER RESOURCES
CORPORATION
TYPE
AREA =3,754,467m2, BRIDGE 13
CONSTRUCTION PERIOD
2012.4–2021.4
LONG SON PETROCHEMICAL
COMPLEX PACKAGE
F–PORT IN VIETNAM
CLIENT
LONG SON PERTOCHEMICALS
TYPE
JETTY 1,500 DWT—100,000 DWTT
(2 BERTHS),
TRESTLE 1.93km,
DREDGING 13,000,000m3
CONSTRUCTION PERIOD
2018.9–2021.9
TAKORADI T2
EXPANSION PROJECT
IN GHANA
CLIENT
KOREA ELECTRIC POWER
TECHNOLOGY
TYPE
WATER INTAKE & DRAIN PIPE 1 LOT
CONSTRUCTION PERIOD
2012.7–2014.6
Water · Environmentnt
ANYANG SAEMUL PARK
(SEWAGE AND SLUDGE
TREATMENT PLANT)
CLIENT
ANYANG CITY WATER AND
SEWERAGE OFFICE
TYPE
SEWAGE TREATMENT PLANT : 250,000m2
SLUDGE TREATMENT AND
DRYING FACILITIES
CONSTRUCTION PERIOD
2008.2–2020.12
CHUNGNAM PROVINCIAL
GOVERNMENT NEW TOWN
AUTOMATIC COLLECTION FACILITY
CLIENT
CHUNGNAM PROVINCIAL
GOVERNMENT DEVELOPMENT
CORPORATION
TYPE
DEPOSITORY: 2 PLACES,
TRANSPORT PIPELINE: 40km
CONSTRUCTION PERIOD
2010.10–2018.9
GWANGJU
COMBUSTIBLE WASTE
CLIENT
CHUNGJUNG BITGOEUL CO., LTD.
TYPE
HOUSEHOLD WASTE (800ton/day)
SOLID FUEL
(SRF) PRODUCT MANUFACTURING
CONSTRUCTION PERIOD
2013.12–2016.11
LAOS NAM LIK 1 HEPP (HYDRO
ELECTRIC POWER PLANT)
CLIENT
NL1PC
TYPE
HYDRO POWER PLANT
(H=48.7m. L=149m,
WATER TUNNEL L=310m,
GENERATOR 32.25MW*2EA,
TRANSMISSION LINE 11km)
CONSTRUCTION PERIOD
2014.5–2019.2
SEMANGKA HYDRO-ELECTRIC
POWER PROJECT IN INDONESIA
CLIENT
PT. TEP (TANGGAMUS ELECTRIC
POWER)
TYPE
55.4MW HYDRO POWER PLANT
(WEIR H 8m, TUNNEL 1,248m,
WATERWAY 5.0km,
POWERHOUSE 1 LOT)
CONSTRUCTION PERIOD
2015.2–2017.11
GREATER YANGON WATER
SUPPLY IMPROVEMENT PROJECT
CLIENT
YANGON CITY DEVELOPMENT COMMITTEE
TYPE
ADDITIONAL FACILITIES IN THE EXISTING
WATER TREATMENT PLANT AND
NEW STORAGE TANK SUPPLY
(3 PUMP FACILITIES
,DISINFECTION FACILITIES 4EA
MANAGEMENT BUILDING 1EA,
STORAGE TANK 2EA 22,000m3, 28,000m3)
CONSTRUCTION PERIOD
2018.1–2021.8
RailwaysㆍSubways
SEONGNAM TRAIN
DEPOT
CLIENT
KOREA RAILROAD AUTHORITY
TYPE
RAILWAY (AREA: 278,436m2,
SERVICE LINE: 1.84km,
VEHICLE DEPOT: 1.13km, 12 QUARRY LINES,
INSPECTION, CONSTRUCTION, ELECTRICAL,
MECHANICAL, SIGNAL, COMMUNICATION)
CONSTRUCTION PERIOD
2012.12–2017.3
SEOUL METRO LINE.9
PHASE.3 LOT NO.921
CLIENT
SEOUL URBAN INFRASTRUCTURE
TYPE
RAILWAY (EXTENSION: 1,742m
(EXCAVATION 382m; SHIELD
TBM 1,274m; NATM 86m))
CONSTRUCTION PERIOD
2009.12–2018.12
MONORAIL FOR LINE 3 OFTHE PANAMA METRO
CLIENT
MPSA(PANAMA METRO CORPORATION)
TYPE
RAILWAY(L=26.7km, MONORAIL
CONSTRUCTION, INCLUDING 14 STATIONS
AND 1 VEHICLE DEPOT)
※OUR SCOPE : AREA-270,000m2, VEHICLE
DEPOT CONSTRUCTION, MANAGEMENT
BUILDING AND 17 OTHER BUILDINGS
CONSTRUCTION PERIOD
2021.2–2025.8
BUILDING
WORKS
BUILDING
WORKS
PLANT
PLANT
INFRA-
STRUCTURE
INFRA-
STRUCTURE